Consultancy for Fiscal Inspection “Design and Construction of the Chacao Bridge.

Client

Dirección de vialidad (Ministerio de obras públicas)

Location

Los Lagos Region

Estimated project investment

$ US 716.000.000

Duration

May 2014 – April 2025

Service

Advisory Services to the Fiscal Inspection
Supervision of the development of the detailed engineering of the final project and of the construction phase of the suspension bridge. Additionally, the service must provide advisory support during the commissioning period and provisional acceptance, as well as on administrative and legal aspects of the contract.