Owner support for the construction of the Quebrada Blanca Phase II Project (expansion).
Client
Teck
Location
Tarapacá Region
Estimated project investment
8.800 US$ mn
Duration
March 2019 – August 2024
Service
Multidisciplinary Specialist
Multidisciplinary Specialist during the Project Execution phase, covering the following disciplines: engineering, procurement and contracts, construction, safety, occupational health, sustainability, quality, project control, and services for the expansion project aimed at extending the operational life for 28 more years. This includes the deepening of the pit for the exploitation of hypogene ore, as well as the construction of processing infrastructure.
Expansion of the Tailings Deposit.
New Concentrator Plant with a capacity of 140 ktpd.
Concentrate Pipeline from Plant to Port, 165 km (from 4,400 meters above sea level to 0 meters above sea level).
Desalinated Water Pipeline from Port to Plant, 165 km (from 0 meters above sea level to 4,400 meters above sea level).
Desalination Plant with an approximate capacity of 1,000 l/s.
Copper Concentrate Shipping Port.